91视频免费看看-白丝喷浆视频免费版-国产高清不卡一区二区-国产精选免费视频-国产一区精品在线-精品亚洲视频在线观

歡迎光臨河北漢洋機械制造有限公司網站!
誠信促進發展,實力鑄就品牌
服務熱線:

15531706865

產品分類

Product category

新聞資訊 / news 您的位置:網站首頁 > 新聞資訊 > Construction/ Nomenclature

Construction/ Nomenclature

發布時間: 2020-02-13  點擊次數: 1132次

Caution: Always wear the appropriate protective gear (safety glasses, gloves, safety shoes,
etc.) when working.
TKP35H22 (Formerly TKP0350)
Point of separation
Moving end bracket
Arm
Horizontal divider
Fixed end bracket
Vertical divider
Link
3. Open the arms from each link on either side of the section to be disassembled.
2. Insert a flat-head screwdriver into the gap between links and twist in the direction of the arrow to remove the pin from the hole.
1. Support the other pins and bend the Cableveyor as shown to separate the ends.
3. Align the ends. 2. Overlap the links, and insert the pins into the hole on one side.
1. Push in the other side, insert the pin, and connect.

 
2
 
 
 
1) Opening arms             2) Removing or attaching arms       3) Closing arms
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Attach vertical dividers when filling your Cableveyor with cables & hoses. With the arms open, attach the vertical dividers as follows. 1. Hook one of the catches on the end of the vertical divider into the link. (circled red in photo on right) 2. Snap in the other catch by pushing the divider down in the direction of the arrow.
 
*Either end of the vertical divider can be used. *Insert horizontal dividers into the vertical divider holes first, and then attach the unit to the link. (Note: This will require more than one vertical divider.)
 
 
 
 
Pretension and sag may appear in the free span depending on the application. However, if selected within Tsubaki’s performance graph then there will be no problems with use.
 
 
 
 
 
 
 
 
1. Machine travel end installation height (H’) should be Cableveyor height H + (10-30). 2. Cableveyor space height (h) is H + 100. 3. Install a guide rail. 4. The difference (ε) in the travel end and fixed end bracket attachment sides should be less than 4mm.  5. Use travel cables/hoses with excellent bending and wear properties. 6. Avoid using cables/hoses with wire braiding, as they are easily damaged.
7. Cables/hoses wear easily when used stacked onto of one another. Lay horizontally or use horizontal dividers. 8. Set cables and hoses in the Cableveyor so that they have some play, and clamp both ends. 9. Remove foreign objects from guide rails, as they may cause damage. 10. The following are shipped unassembled and will require assembly when installing the Cableveyor.  (Moving/fixed end) plastic brackets  Vertical/horizontal dividers
 
Any unevenness on the plastic bracket installation surface may damage the bracket. Ensure that the installation surface is as smooth as possible. Over-tightening the installation bolts can also damage the plastic bracket. Please use the following recommended tightening torque.
 
Bolt Size Recommended Tightening Torque M6 2.6 N?m




主站蜘蛛池模板: 人人添人人妻人人爽夜欢视av| r级无码视频在线观看| 久久青青草视频| 国产色婷婷五月精品综合在线| 男人用嘴添女人下身免费视频| 欧美高清成人| 国精产品999一区二区三区有限| 国产a精品| 亚洲精品一区二区三区福利| 日本高清在线中文字幕网| 色偷偷色噜噜狠狠网站久久| 日本三级一区二区| 日日夜夜精品免费视频| 99国产欧美久久久精品| 日日碰狠狠躁久久躁蜜桃| 91视频精选| 亚洲字幕在线观看| 熟女毛片| 亚洲国产视频在线观看| 久久天天躁狠狠躁夜夜avapp| 201天天爱天天做| 丁香亚洲| caoliushequ2017| 久久y| 国产精品久久久久久婷婷| 一区二区三区在线 | 欧洲| 日韩性freexxxx在线观看| 久草黄视频| www.嫩草影院.com| 丁香花在线影院观看在线播放| 色欲一区二区三区精品a片| 亚洲色中文字幕无码av| 深夜影院老司机69影院| 蜜桃久久| 日本国产成人精品视频| 大地资源中文在线观看官网第二页 | 涩涩天堂| 久久中字| 欧美在线视频一区二区| 色综合综合色| 日韩精品久久久久|